Brighton Wastewater Pollution Control Plant

Province: Ontario

City/Region: Brighton

Image Credit: NAC Constructors Ltd.

43

Project Rank

Project End: 2028

Project Amount: $50 Million

Industry Sector: Wastewater

Funding Source: N/A

LEED Status: N/A

YearRank

About The Project

THE NEW facility will replace the municipality’s existing pond-based wastewater system with a modern mechanical treatment plant designed to operate more efficiently and meet higher environmental standards.

The new facility will include a new operations building, new headworks, primary and secondary treatment systems, UV disinfection, an effluent outfall to Presqu’ile Bay, and biosolids handling equipment. The project also includes upgrades to the existing Queen Street Pumping Station and construction of a new forcemain to carry flows to the new facility.

Contractor: NAC Constructors Ltd.

Key Players

Key Players’ recognize the organizations whose work, knowledge, and expertise go into constructing and delivering the significant projects that make our annual list.

Platinum (12+ Projects)

Gold (9-11 Projects)

Silver (6-8 Projects)