Springbank Off-Stream Reservoir
Province: Alberta
City/Region: Calgary
11
Current Rank
Project End: 2025
Project Amount: $744 Million
Industry Sector: Stormwater
Funding Source: Public
LEED Status: N/A
Year | Rank |
---|---|
2024 | 9 |
About The Project
WHEN OPERATIONAL, the Springbank Off-Stream Reservoir Project (SR1) will work in tandem with the Glenmore Reservoir and other flood mitigation infrastructure in and around Calgary.
The SR1 Project includes: a diversion structure on the Elbow River; a 4.7-kilometre diversion channel; a 29-metre earthen dam stretching approximately 3.8 kilometres; and a series of hydraulic structures and two overpass bridges above the diversion channel, totalling 70,000 cubic metres of reinforced concrete. In total, earth work volume for this project is estimated at around five million cubic metres.
Project Owner: Alberta Transportation and Economic Corridors
Engineer: Stantec; Golder (WSP) (environmental); Wood (WSP) (consulting)
Contractor: VINCI Infrastructure Canada (general contractor)
Environmental Services: Stantec
Other Key Players: Graham (bridges and concrete structures); EY (risk advisor)