Queensway East Cawthra Trunk Sewer
Province: Ontario
City/Region: Mississauga
35
Current Rank
Project End: 2031
Project Amount: $60 Million
Industry Sector: Drinking Water
Funding Source: Public
LEED Status: N/A
Year | Rank |
---|---|
2024 | 31 |
About The Project
THE STANTEC team will work with Peel Region and provide engineering services for the design and construction management of this project consisting of the Queensway East Trunk Sewer, Cawthra Trunk Sewer Phase 4, and the Queensway Transmission Main Pressure Zone 2 Upgrades. Peel Region is embarking on this significant project that consists of approximately 6.4 km of tunneled trunk level sewers and up to 4.1 km of water feedermains. This infrastructure is part of major system upgrades that will provide additional capacity to service growth within the Mississauga City Centre Area to 2041 and beyond.
The system will be designed to help Peel achieve its strategy to enhance overall system reliability and resiliency for the sanitary and water systems.
Project Owner: Region of Peel
Project/Construction Manager: Stantec