Coquitlam Water Main Project
Province: British Columbia
City/Region: Cities of Coquitlam and Port Coquitlam
8
Current Rank
Project End: 2026 pre-build, early 2030s overall water main
Project Amount: $1.66 Billion
Industry Sector: Drinking Water
Funding Source: Public
LEED Status: N/A
Year | Rank |
---|---|
2024 | 10 |
About The Project
METRO VANCOUVER is constructing a new water main in the City of Coquitlam to optimize the capacity of the existing Coquitlam water supply system and to meet the growing demand for drinking water in the region with the eventual expansion of the source supply under the Coquitlam Lake Water Supply Project. The Coquitlam Water Main is approximately 12 kilometres long, and ranges in diameter from 2.2 to 3.2 metres.
The water main is being constructed in four sections. Construction of the first pre build section is underway. This water main is one of a number of drinking water infrastructure projects Metro Vancouver is constructing in the City of Coquitlam over the next two decades.
Project Owner: Metro Vancouver
Project/Construction Manager: Stantec
Engineer: Jacobs-WSP
Contractor: Michels Canada