Capilano Water Supply Infrastructure
Province: British Columbia
City/Region: Vancouver
40
Current Rank
Project Start: 2022
Project End: 2025
Project Amount: $50 Million
Industry Sector: Drinking Water
Funding Source: Public
LEED Status: N/A
Year | Rank |
---|---|
2024 | 36 |
About The Project
METRO VANCOUVER is upgrading drinking water infrastructure in the Metro Vancouver Water Supply Area near Capilano River Regional Park to ensure the continued delivery of high-quality drinking water to a growing region. Upgrades include a backup power system and improvements to the Capilano Water Supply Area security gatehouse. Additionally, the North Shore Rescue Society will be building a new command post and storage building.
These projects were scheduled to begin construction in fall 2022 and be completed by late 2025.
Project Owner: Metro Vancouver

Key Players
Platinum (15+ Projects)
Sorry, there are no results for this section